Processing and circular economy
Closing material and resource loops: processing of local raw materials, recovery of waste and by-products.
No data yet.
Regional value chains
Local production, economic cooperation, substitution of the economically justified share of external purchases.
No data yet.
Intra- and inter-municipal projects
Joint projects of settlements and hromadas.
No data yet.
Territorial development needs
Needs declared by the hromada, its settlements and local participants.
Volovetska hromada
- Water supply and treatmentAbout 50% of residents are connected to central water supply; the strategy's target for 2027 is at least 60%. The intake on the Volivchyk stream was built in 1978 and was 80% worn according to a 2004 survey. The project “Clean water from the foot of the Borzhava polonyna” is active in DREAM.
- Waste managementThe landfill is 75% full, with no sorting. Reconstruction of the landfill with a sorting station at Shyroke Pole: 87,37 million UAH, 72 months.
- Housing, including for internally displaced personsReconstruction of the former club at 28b Yablunovo Street in Volovets into 27 temporary places for internally displaced persons: 9,48 million UAH. As of 01.01.2026, 1 240 IDPs were registered in the hromada.
- Education (school, kindergarten)Energy-saving reconstruction of the roof of Skotarske lower secondary school: 16,08 million UAH.
- Education (school, kindergarten)Fire protection systems for Volovets lyceum: 3,0 million UAH.
- Education (school, kindergarten)Off-road school bus for more than 30 pupils of Volovets lyceum from mountain areas: co-financing of 0,5 million UAH.
- Education (school, kindergarten)Equipment for science and mathematics classrooms: 1,0 million UAH; learning aids for children with special educational needs: 0,8 million UAH.
- Sport and physical educationReconstruction of the Avanhard stadium, 49 Pidhirna Street, Volovets: 24,6 million UAH.
- Culture and cultural heritageRestoration of the Shaio Hrinberh mansion, home of the school of arts, 58 Karpatska Street: 41,0 million UAH.
- Public safety and civil protectionLocal automated public warning system: 2,19 million UAH; CCTV in public places under the regional “Safe Zakarpattia” programme: 0,4 million UAH.
- Energy (power, heating)Worn-out electrical substations and power lines (development strategy).
- RoadMost municipal roads are unpaved (development strategy).
Project costs are estimates at the investment feasibility stage in the hromada's single project portfolio (DREAM, September 2026). Inclusion in the portfolio does not mean that funding has been allocated.
Sources: Project DREAM-UA-190324-25677008 “Clean water from the foot of the Borzhava polonyna…” (DREAM data on platforma.in.ua); Single project portfolio of the hromada in the DREAM system, September 2026; Development strategy of Volovetska hromada to 2027 (outlook to 2034), council decision of 24.09.2026 No. 1719. Compiled by the association from open sources, checked on 25.11.2026.
Investment projects
Use of untapped natural, economic, productive and tourism potential.
No data yet.
Public investment
The hromada’s projects in DREAM, Ukraine’s state recovery ecosystem: cost, secured funding, amount missing, stage and sector.
- Projects in DREAM
- 11
- Estimated cost
- 84,0 million UAH
- Secured funding
- 4,4 million UAH
- Funding gap
- 79,6 million UAH
Possible cooperation with neighbouring hromadas
Neighbouring hromadas (centres no more than 35 km apart) are preparing projects in the same sectors in DREAM. Joint preparation, joint procurement or a shared facility can lower the cost for each hromada.
- Education: Nyzhnovoritska hromada (5), Pylypetska hromada (2), Polianska hromada (3), Slavska hromada (2), Svaliavska hromada (2), Keretskivska hromada (2), Kozivska hromada (2), Mizhhirska hromada (2)
- Water supply and sewerage: Polianska hromada (1), Slavska hromada (4), Svaliavska hromada (4)
- Safety and civil protection: Nelipynska hromada (1), Slavska hromada (1)
Source: hromada profile in DREAM. DREAM data is updated daily; last synchronised 26.11.2026. Project titles translated from Ukrainian.